Accrue

What This Is

Accrue is an open-source Elixir/Phoenix payments and billing library, inspired by Pay (Rails) and Laravel Cashier but built idiomatically for the Elixir/Ecto/Plug/Phoenix ecosystem. It gives Phoenix SaaS developers a batteries-included "jumpstart" for everything a real SaaS business needs on day one — subscriptions, checkout, invoices, coupons, emails, PDFs, webhooks, admin UI, telemetry — without the migration pain and design regrets earlier libraries accumulated.

Tagline: "Billing state, modeled clearly."

Core Value

A Phoenix developer can install Accrue + its companion admin UI, and launch a real SaaS with subscription billing on day one — complete, production-grade, with idiomatic Elixir DX, strong domain modeling, tamper-evident audit ledger, great observability, and zero breaking-change pain for at least the first major version. Everything else is in service of that.

Current milestone

v1.30 — 1.0.0 Declaration (Spine A) (opened 2026-04-26)

Goal: Cut accrue / accrue_admin 1.0.0 on a single linked Hex publish, with the final post-publish contract sweep verifying everything is consistent at 1.0.0, the planning mirror aligned, the stability posture flipped to "1.0.0 stable, post-1.0 cadence," and a dated post-publish friction-inventory maintainer pass to certify the post-1.0 surface. PROC-08 (second processor) and FIN-03 (app-owned finance exports) remain explicitly out of scope at 1.0.0 — calling stable does not lift those non-goals.

Target features:

  • REL-05..08 — Linked 1.0.0 Hex publish (single coordinated cut for accrue and accrue_admin), CHANGELOG "1.0.0 — Stable" entry per package, RELEASING.md post-1.0 cadence section (semver discipline + deprecation policy), planning git tag v1.30.
  • PPX-09..12 — Final post-publish contract sweep at 1.0.0: verify_package_docs + verify_adoption_proof_matrix + the six-script docs-contracts-shift-left bundle re-run clean at 1.0.0; First Hour + host README + adoption matrix needles refreshed across the surface for the 0.3.1 → 1.0.0 jump.
  • HYG-02.planning/ mirror pass (PROJECT.md, MILESTONES.md, STATE.md) aligned to the published 1.0.0 pair after the linked publish lands.
  • DOC-03..04accrue/README.md Stability + root README maintenance posture flipped from "pre-1.0 closure" to "1.0.0 stable, post-1.0 cadence"; PROJECT.md non-goals section retained (PROC-08 / FIN-03 reaffirmed as explicitly out of scope at 1.0.0, with written boundaries — not lifted).
  • INV-07 — Post-1.0 dated maintainer pass (b) in v1.17-FRICTION-INVENTORY.md certifying the inventory remains accurate at 1.0.0.

Key context:

  • Forcing function for the 1.0.0 declaration (Spine A) has been deferred since v1.28; v1.27/28/29 each closed cleanly with no half-finished migrations overhanging the surface, so calling 1.0.0 now does not stack risk.
  • Same spine pattern as v1.11 (REL-01..04 / DOC-01..02 / HYG-01) and v1.23/v1.28 (PPX-01..08), but bumped to 1.0.0 rather than another 0.3.x patch.
  • "Ship complete, not MVP" — calling 1.0.0 is the obligation embedded in the project's Core Value (zero breaking-change pain through v1.x), not a stretch.
  • No new feature surface in this milestone — explicitly out of scope (no second processor, no app-owned finance exports, no new billing primitives).

Phase numbering: continues from v1.29 → starts at Phase 91 (default; no --reset-phase-numbers).

Live planning artifacts (during this milestone): .planning/REQUIREMENTS.md, .planning/ROADMAP.md (to be regenerated by the new-milestone flow).

v1.29 — Mailglass Integration (archived 2026-04-26)

Goal (shipped): Replaced mjml_eex and phoenix_swoosh with the Mailglass framework as a path dependency. Mailglass provides HEEx-native components (no Node MJML compile), an append-only event ledger, native database-level idempotency via idempotency_key, and a LiveView dev-preview dashboard mounted at /dev/mail in accrue_admin. No PROC-08 / FIN-03.

Shipped:

  • MG-01..MG-03 (Phase 88 — Foundation): path-dep mailglass in accrue and mailglass_admin (dev+test) in accrue_admin; /dev/mail LiveView mounted via sibling scope; install + email guides updated for the three Mailglass migrations. Validated 2026-04-25 — 088-VERIFICATION.md (5/5).
  • MG-04..MG-06 (Phase 89 — Proof of Concept): Accrue.Workers.Mailer dispatches via Mailglass.deliver/1 with explicit idempotency_key (Oban unique: [period: 60] removed); Accrue.Emails.Receipt + Accrue.Emails.PaymentFailed ported to Mailglass.Mailable with PDF attachment intact. Validated 2026-04-26 — 089-01-SUMMARY.md, 089-02-SUMMARY.md.
  • MG-07 (Phase 90 — Cleanup): all 13 transactional templates Mailglass-backed; mjml_eex + phoenix_swoosh removed from accrue/mix.exs; 26 legacy .mjml.eex/.text.eex deleted; mix accrue.mail.preview + Accrue.Emails.HtmlBridge + Accrue.Workers.Mailer.template_for/1 retired; mailglass_cleanup_test guards regressions. Validated 2026-04-26 — 090-VERIFICATION.md (6/6) + 090-UAT.md (7/7 automated).

Archives: milestones/v1.29-ROADMAP.md, milestones/v1.29-REQUIREMENTS.md. Phase trees: milestones/v1.29-phases/. Git tag: v1.29. Next forcing function: linked Hex publish for Mailglass itself (gating Mailglass on Hex via ~> x.y instead of path dep) — outside this milestone's scope.

v1.28 — Next linked publish continuity (archived 2026-04-25 — planning complete 2026-04-24)

Goal (planning closed): Post-publish contract work (PPX-05..08, same semantics family as v1.23 PPX-01..04) and the dated friction-inventory maintainer pass (INV-06). Strategic spine B (maintenance / wrap-up plan). No PROC-08 / FIN-03.

Shipped artifacts:

  • PPX-05..08 — Package docs, adoption matrix + script, docs-contracts-shift-left, .planning/ Hex mirrors aligned to the new @version / registry reality. Validated 2026-04-24 — .planning/milestones/v1.28-phases/086-post-publish-contract-alignment/086-VERIFICATION.md (re-verification at 0.3.1).
  • INV-06 — Post-publish v1.17-FRICTION-INVENTORY.md maintainer pass (b) with 087-VERIFICATION.md verifier evidence. Validated 2026-04-24 — .planning/milestones/v1.28-phases/087-friction-inventory-post-publish/087-VERIFICATION.md.

Archived requirements: .planning/milestones/v1.28-REQUIREMENTS.md. Phases: 86–87 in .planning/milestones/v1.28-ROADMAP.md. Next forcing function: linked Hex publish per RELEASING.md (outside this in-repo planning milestone).

v1.27 — Pre-1.0 closure narrative (archived 2026-04-24)

Goal (shipped): Make the “parked / intake-gated” maintainer posture and pre-1.0 vs 1.0.0 intent legible on integrator front doors and release docs—without new billing primitives. Close with a dated friction inventory maintainer pass after the doc touch (INV-05). No PROC-08 / FIN-03.

Shipped:

  • CLS-01 — Root + accrue README surfaces link maturity-and-maintenance + production-readiness and state intake-gated work (no speculative roadmap implied).
  • CLS-02RELEASING.md documents pre-1.0 closure maintainer intent; upgrade.md adds wrap-up semantics pointer to maturity doc.
  • CLS-03accrue/README.md Stability clarifies 0.x ≠ open-ended feature expansion; PROC-08 / FIN-03 remain PROJECT.md non-goals (cross-linked from root Maintenance posture).
  • INV-05 — Post-CLS doc touch: maintainer pass (b) on v1.17-FRICTION-INVENTORY.md with 085-VERIFICATION.md verifier transcripts (same bundle family as INV-03 / INV-04).

Evidence: .planning/milestones/v1.27-ROADMAP.md, v1.27-REQUIREMENTS.md, milestones/v1.27-phases/84-pre-1-0-closure-narrative/084-VERIFICATION.md, milestones/v1.27-phases/85-friction-inventory-post-closure/085-VERIFICATION.md; inventory ### v1.27 INV-05 maintainer pass (2026-04-24); planning git tag v1.27.

v1.26 — First-hour billing facade spine (archived 2026-04-24)

Goal (shipped): Put Accrue.Billing.create_billing_portal_session/2 on the same First Hour + host README + adoption proof matrix + verifier plane as create_checkout_session, then run a dated friction-inventory maintainer pass after that doc touch. No PROC-08 / FIN-03.

Shipped:

  • INT-13 — Guide capsule, host README parity (D-02 / INT-11), matrix row + verify_adoption_proof_matrix (and coupled doc verifiers in the same PR when required). Validated in Phase 82 (milestones/v1.26-phases/082-first-hour-portal-spine/082-VERIFICATION.md).
  • INV-04 — Path (b) dated maintainer certification + 083-VERIFICATION.md (milestones/v1.26-phases/083-friction-inventory-post-touch/083-VERIFICATION.md).

Evidence: .planning/milestones/v1.26-ROADMAP.md, v1.26-REQUIREMENTS.md, execution trees milestones/v1.26-phases/; planning git tag v1.26.

v1.25 — Evidence-bound triad (friction + integrator + billing depth) (archived 2026-04-24)

Goal (shipped): INV-03 maintainer pass; Accrue.Billing.create_checkout_session/2 (BIL-06) with Fake + :telemetry / span; BIL-07 / INT-12 telemetry + integrator needles — no PROC-08 / FIN-03.

Evidence: .planning/milestones/v1.25-ROADMAP.md, v1.25-REQUIREMENTS.md, execution trees milestones/v1.25-phases/; planning git tag v1.25.

v1.24 — Billing portal facade + customer PM operator surfaces (archived 2026-04-24)

Goal: Ship bounded billing depth (customer Billing Portal session creation on Accrue.Billing with Fake-provable tests and telemetry aligned to guides/telemetry.md / runbooks) plus admin/operator quality on the customer payment_methods tab (AccrueAdmin.Copy, ax-*, VERIFY-01 where routes change materially). No PROC-08 / FIN-03; no integrator-milestone or Hex-release theme.

Shipped (planning):

  • Accrue.Billing.create_billing_portal_session/2 (+ !) delegating to Accrue.BillingPortal.Session, with :telemetry / span parity and catalog/runbook updates (BIL-04, BIL-05) — 78-VERIFICATION.md under milestones/v1.24-phases/78-billing-portal-on-accrue-billing-telemetry-truth/.
  • Customer LiveView payment-methods tab: Copy SSOT burn-down, token discipline, theme exceptions (ADM-13, ADM-14) — 76-VERIFICATION.md.
  • VERIFY-01 + axe on materially touched customer paths; export_copy_strings / copy_strings.json hygiene (ADM-15, ADM-16) — 77-VERIFICATION.md.

Last closed: v1.27 (Phases 84–85); prior v1.26 (Phases 82–83); prior v1.25 (Phases 79–81); prior v1.24 (Phases 76–78); prior v1.23 (2026-04-24).

v1.23 — Post-publish contract alignment (Branch A — archived 2026-04-24)

Goal: After each linked Hex publish for accrue / accrue_admin, keep merge-blocking package docs, adoption proof matrix, and docs-contracts-shift-left (including production-readiness discoverability) honest, and align .planning/ public-Hex callouts — so integrators on main and on Hex see one coherent pin and doc story.

Shipped: PPX-01..PPX-04; evidence milestones/v1.23-phases/75-post-publish-contract-alignment/75-VERIFICATION.md; v1.17-P1-002 closed in the friction inventory. Archives: .planning/milestones/v1.23-ROADMAP.md, v1.23-REQUIREMENTS.md. Planning git tag v1.23.

v1.22 — Production path discoverability is archived (2026-04-24). Phase 74; PRS-01..PRS-03 validated. Phase tree: .planning/milestones/v1.22-phases/74-production-path-discoverability/. Archives: .planning/milestones/v1.22-ROADMAP.md, v1.22-REQUIREMENTS.md. Planning git tag v1.22.

v1.21 — Maturity posture and diminishing returns is archived (2026-04-23). Phases 72–73; MAT-01..MAT-02, INT-11 validated. Phase trees: .planning/milestones/v1.21-phases/. Archives: .planning/milestones/v1.21-ROADMAP.md, v1.21-REQUIREMENTS.md. Planning git tag v1.21.

v1.20 — Professional adoption confidence is archived (2026-04-24). Phases 70–71; INV-01..INV-02, PRD-01..PRD-02 validated. Phase trees: .planning/milestones/v1.20-phases/. Archives: .planning/milestones/v1.20-ROADMAP.md, v1.20-REQUIREMENTS.md. Planning git tag v1.20.

v1.19 — Release continuity + proof resilience is archived (2026-04-24). Phases 67–69; PRF-01..PRF-02, REL-01..REL-03, DOC-01..DOC-02, HYG-01 validated. Phase trees: .planning/milestones/v1.19-phases/67-proof-contracts/, 68-release-train/, 69-doc-planning-mirrors/. Archives: .planning/milestones/v1.19-ROADMAP.md, v1.19-REQUIREMENTS.md. Planning git tag v1.19.

Library maintenance posture (v1.21)

  • Maintenance mode — merge-blocking VERIFY-01, verify_package_docs, and host-integration stay honest on main; default work is intake-gated (security, correctness, Hex publish, sourced integrator stall) rather than speculative multi-file doc sweeps. See stop rules S1 / S5 in North star.
  • New friction — add rows only in Friction inventory using the table priority bar and sources; do not hide scope in ROADMAP prose alone.
  • Revisit triggers — maintainer pass on the inventory after linked Hex publish for accrue / accrue_admin, or intentional adoption-proof-matrix / verify_adoption_proof_matrix.sh taxonomy edits (same-PR co-update discipline from v1.19 PRF).
  • Spine for humans — ship checklist accrue/guides/production-readiness.md; maintainer-facing summary accrue/guides/maturity-and-maintenance.md.

Triage doctrine (read-only context, v1.17–v1.18): North star + stop rules · Friction inventory

v1.18 — Onboarding confidence is archived (2026-04-23). Phase 66; UAT-01..UAT-05, PROOF-01 validated. Phase tree: .planning/milestones/v1.18-phases/66-onboarding-confidence/. Archives: .planning/milestones/v1.18-ROADMAP.md, v1.18-REQUIREMENTS.md. Planning git tag v1.18.

v1.17 — Friction-led developer readiness is archived (2026-04-23). Phases 62–65; FRG-01..FRG-03, INT-10, BIL-03, ADM-12 validated. Archives: .planning/milestones/v1.17-ROADMAP.md, v1.17-REQUIREMENTS.md; planning git tag v1.17. Phase working trees: .planning/milestones/v1.17-phases/.

v1.16 — Integrator + proof continuity is archived (2026-04-23). Phases 59–61; INT-06..INT-09 validated. Archives: .planning/milestones/v1.16-ROADMAP.md, v1.16-REQUIREMENTS.md. Planning git tag v1.16.

v1.15 — Release / trust semantics is archived (2026-04-23). Phases 57–58; TRT-01..TRT-04 validated. Archives: .planning/milestones/v1.15-ROADMAP.md, v1.15-REQUIREMENTS.md. Planning git tag v1.15.

v1.14 — Companion admin + billing depth is archived (2026-04-23). Phases 54–56; ADM-07..ADM-11, BIL-01..BIL-02 validated. Archives: .planning/milestones/v1.14-ROADMAP.md, v1.14-REQUIREMENTS.md. Planning git tag v1.14.

v1.13 — Integrator path + secondary admin parity is archived (2026-04-23). Phases 51–53; INT-01..INT-05, AUX-01..AUX-06 validated. Archives: .planning/milestones/v1.13-ROADMAP.md, v1.13-REQUIREMENTS.md. Planning git tag v1.13.

v1.12 — Admin & operator UX is archived (2026-04-22). Phases 48–50; ADM-01..ADM-06 validated. Archives: .planning/milestones/v1.12-ROADMAP.md, v1.12-REQUIREMENTS.md. Planning git tag v1.12.

v1.11 — Public Hex release + post-release continuity is archived (2026-04-22). Phases 46–47; REL-01..REL-04, DOC-01..DOC-02, HYG-01 validated. Archives: .planning/milestones/v1.11-ROADMAP.md, v1.11-REQUIREMENTS.md. Git tag v1.11.

v1.10 — Metered usage + Fake parity is archived (2026-04-22). Phases 43–45; MTR-01..MTR-08 validated. Archives: .planning/milestones/v1.10-ROADMAP.md, v1.10-REQUIREMENTS.md. Spike retained: .planning/research/v1.10-METERING-SPIKE.md. Git tag v1.10.

v1.9 — Observability & operator runbooks is archived (2026-04-22). Archives: .planning/milestones/v1.9-ROADMAP.md, v1.9-REQUIREMENTS.md. Gap audit (research): .planning/research/v1.9-TELEMETRY-GAP-AUDIT.md. Git tag v1.9.

v1.7 Adoption DX + operator admin depth is archived (2026-04-21). Archives: .planning/milestones/v1.7-ROADMAP.md, v1.7-REQUIREMENTS.md, v1.7-MILESTONE-AUDIT.md (passed). Git tag v1.7.

Non-goals (until reprioritized in a future milestone)

PROC-08 (second processor) and FIN-03 (app-owned finance exports) remain explicitly out of scope until a later milestone prioritizes them with written boundaries. Stripe Dashboard meter setup UX stays host/Stripe documentation unless a future requirement explicitly pulls UI scope in.

Reaffirmed at 1.0.0 (2026-04-26)

  • PROC-08 (second processor): explicit non-goal at 1.0.0; revisit only via later-milestone reprioritization with written boundaries.
  • FIN-03 (app-owned finance exports): explicit non-goal at 1.0.0; Accrue is a billing/subscription library, not an accounting system; revisit only via later-milestone reprioritization with written boundaries.

Current State

Install literals / {:accrue, "~> …"} / {:accrue_admin, "~> …"} in package READMEs and First Hour follow mix.exs @version on the branch you are reading — enforced by verify_package_docs.

Public Hex (last published): registry reality for consumers — accrue on Hex and accrue_admin on Hex (0.3.1 each; linked publish v1.19 Phase 68, contract pass v1.23 Phase 75 2026-04-24) — updates on publish / HYG, not on arbitrary doc commits. Workspace @version on main matches the published pair.

Active planning milestone: v1.28Next linked publish continuity (Phases 86–87 complete per 086-VERIFICATION.md / 087-VERIFICATION.md; PPX-05..08 + INV-06 in .planning/REQUIREMENTS.md 2026-04-24). Workspace @version remains 0.3.1 until the next linked Hex release bumps it.

Last shipped planning milestone: v1.27 — Phases 84–85 (2026-04-24): CLS-01..03, INV-05; milestones/v1.27-*; execution trees milestones/v1.27-phases/; planning tag v1.27. Prior: v1.26 — Phases 82–83 (2026-04-24): INT-13, INV-04; milestones/v1.26-*; execution trees milestones/v1.26-phases/; planning tag v1.26. Earlier: v1.25 — Phases 79–81; v1.25-* + v1.25-phases/; tag v1.25. v1.24 — Phases 76–78; v1.24-* + v1.24-phases/; tag v1.24. v1.23 — Phase 75 (PPX-01..04); v1.23-* + v1.23-phases/; v1.17-P1-002 closed; tag v1.23. v1.22 — Phase 74; v1.22-*; tag v1.22. v1.21 — Phases 72–73; v1.21-* + v1.21-phases/; tag v1.21. v1.20 — Phases 70–71; v1.20-* + v1.20-phases/; tag v1.20. v1.19 — Phases 67–69; v1.19-* + v1.19-phases/; tag v1.19. v1.18 — Phase 66; v1.18-phases/; tag v1.18. v1.17v1.17-* + v1.17-phases/; tag v1.17.

Execution history: v1.27 Phases 84–85 under milestones/v1.27-phases/ (084-VERIFICATION.md, 085-VERIFICATION.md). v1.26 Phases 82–83 under milestones/v1.26-phases/ (082-VERIFICATION.md, 083-VERIFICATION.md). v1.25 Phases 79–81 under milestones/v1.25-phases/ (079-VERIFICATION.md, 080-VERIFICATION.md, 081-VERIFICATION.md). v1.24 Phase 78 — billing portal on Accrue.Billing + telemetry truth (milestones/v1.24-phases/78-billing-portal-on-accrue-billing-telemetry-truth/78-VERIFICATION.md); v1.24 Phase 77 — customer PM tab VERIFY + theme + copy export (milestones/v1.24-phases/77-customer-pm-tab-verify-theme-copy-export/77-VERIFICATION.md); v1.24 Phase 76 — customer PM inventory + Copy (milestones/v1.24-phases/76-customer-pm-tab-inventory-copy-burn-down/76-VERIFICATION.md). v1.23 Phase 75 under milestones/v1.23-phases/; v1.22 Phase 74 under milestones/v1.22-phases/; v1.21 Phases 72–73 under milestones/v1.21-phases/; v1.20 Phases 70–71 under milestones/v1.20-phases/; v1.19 Phases 67–69 under milestones/v1.19-phases/; v1.18 Phase 66 under milestones/v1.18-phases/; v1.17 under milestones/v1.17-phases/.

Shipped: v1.7 Adoption DX + operator admin depth (2026-04-21)

Goal: Clearer evaluator VERIFY-01 / adoption doc paths; honest installer + CI semantics; operator-first admin entry, drill, and nav; token-safe dashboard surfaces with AccrueAdmin.Copy SSOT; audit corpus + verifier ownership + dual-contract documentation.

Delivered (high level): Phases 32–33 (ADOPT-01..06), 34 (OPS-01..03), 35 (OPS-04..05), 36 (integration hardening + forward-coupling). Evidence: .planning/milestones/v1.7-ROADMAP.md / v1.7-REQUIREMENTS.md; granular phase trees were under .planning/phases/ until the 2026-04-23 prune (recoverable from git history).

Shipped: v1.6 Admin UI / UX polish (2026-04-20)

Goal: Bring the companion admin (and evaluator-visible mounted paths) to a consistent, accessible, mobile-credible bar aligned to Phase 20/21 UI-SPEC contracts—without new billing domain scope or third-party UI kits.

Delivered:

  • Phase 25 — Route matrix, component coverage notes, and UI-SPEC alignment (v1.6 milestone; .planning/milestones/v1.6-ROADMAP.md, prior phase path 25-admin-ux-inventory in git history).
  • Phase 26ax-* hierarchy on money indexes, detail pages, and webhooks; theme token discipline with documented exceptions.
  • Phase 27 — Operator microcopy pass and AccrueAdmin.Copy for stable literals in tests.
  • Phase 28 — Focus, captions, contrast verification, and mounted-admin axe in VERIFY-01.
  • Phase 29 — Mobile Playwright coverage and README mobile shell guidance for mounted admin.

The v1.0 milestone delivered the full billing library, companion admin UI, installer/test DX, release automation, docs, and OSS policy surface.

The v1.1 milestone proved the packages from a real Phoenix user's point of view:

  • examples/accrue_host is a realistic host app that installs and uses accrue and accrue_admin through public APIs.
  • The host app proves signed-in billing, signed webhook ingest, admin inspection/replay, audit evidence, clean-checkout rebuild, and local boot paths.
  • CI runs a Fake-backed host integration gate with Playwright browser coverage, retained failure artifacts, Hex-mode smoke validation, and warning/error annotation sweeps.
  • First-user DX is hardened through installer no-clobber reruns, conflict sidecars, shared setup diagnostics, host-first docs, troubleshooting anchors, and package-doc verification.

The v1.2 milestone made Accrue ready for new Phoenix teams to evaluate and trust: examples/accrue_host is the canonical local demo/tutorial path, the repository and package docs are host-first, mature OSS support assets are in place, trust evidence is checked in and executable, and expansion discovery ranked Stripe Tax, organization billing, and finance handoff as the next expansion candidates.

Last Shipped Milestone: v1.3 Tax + Organization Billing

Goal: Let Phoenix SaaS teams bill organizations with Stripe Tax enabled, preserve tenant boundaries through Sigra or equivalent host-owned scopes, and hand finance workflows to Stripe-native reporting without Accrue owning accounting semantics.

Delivered:

  • Stripe Tax on subscriptions and checkout with Fake-backed regression coverage and narrow local tax observability.
  • Public tax-location updates, invalid-location recovery, finalization-failure surfacing, and rollout-safety documentation.
  • Sigra-first org billing proof, owner-scoped admin queries, webhook replay ambiguity handling, and cross-tenant denial UX.
  • VERIFY-01 executable proof (host tests + Playwright + README/CI contract) plus finance handoff guide and doc contract test (Phase 22).

Earlier milestone: v1.2 Adoption + Trust

Goal: Make Accrue feel ready for a new Phoenix team to evaluate, integrate, and trust by polishing the canonical demo/onboarding path, adding mature-library quality signals, and deciding the next expansion bet without partially implementing it.

Delivered:

  • Canonical local demo path built around examples/accrue_host, with documented setup, seeded Fake-backed billing/admin flow, and CI-equivalent verification.
  • Host-first tutorial and public docs front door that connect install, first subscription, signed webhook ingest, admin inspection/replay, troubleshooting, production hardening, and package support policy.
  • Mature OSS adoption assets: repository README, issue templates, release guidance, and clear Fake vs Stripe test vs live Stripe positioning.
  • Trust hardening bundle covering webhook/auth/admin security, seeded performance smoke checks, compatibility, accessibility/responsive browser checks, secret/PII log review, and required-vs-advisory release-gate boundaries.
  • Expansion discovery for tax, revenue/export, additional processors, and organization/multi-tenant billing captured as ranked future recommendations only.

Shipped: v1.5 Adoption proof hardening (2026-04-18)

Goal: Make VERIFY-01 + Fake CI + Stripe test-mode parity discoverable for evaluators; ship an evaluator screen-recording checklist; document B2C-shaped API vs org-first LiveView coverage.

Delivered:

  • examples/accrue_host/docs/adoption-proof-matrix.md and evaluator-walkthrough-script.md, linked from the host README and enforced by verify_verify01_readme_contract.sh.
  • accrue/guides/testing.md cross-links the matrix and guides/testing-live-stripe.md; live-Stripe guide states job id vs Stripe mode.
  • GitHub Actions live-stripe job display name now reads Stripe test-mode parity (advisory) (job id unchanged for act compatibility).
  • AccrueHost.BillingFacadeTest module doc references the adoption matrix (PROOF-02 traceability).

Shipped: v1.4 Ecosystem stability + demo visuals (2026-04-17)

Goal: Stay current on published lattice_stripe within ~> 1.1, and make the Fake-backed host + mounted admin walkthrough trivial to see (screenshots + CI artifacts).

Delivered:

  • lattice_stripe lockfiles refreshed across accrue, accrue_admin, and examples/accrue_host (latest on Hex at time of work: 1.1.0).
  • Visual walkthrough docs, npm run e2e:visuals, and CI artifact pointers; Playwright trust lane green on desktop + mobile.
  • Committed accrue_admin priv/static JS/CSS is a real esbuild bundle so mounted admin LiveView works in the browser; mix verify.full rebuilds admin assets before Playwright.

Explicitly deferred: PROC-08 (second processor), FIN-03 product exports — revisit in a later milestone. ORG-04 is in scope for v1.8 (recipes + host integration depth).

Continue to treat tax rollout correctness, cross-tenant billing leakage, and wrong-audience finance exports as release risks regardless of milestone.

Requirements

Validated

v1.0 Initial Release shipped and validated on 2026-04-16. Detailed requirement outcomes are archived in .planning/milestones/v1.0-REQUIREMENTS.md.

v1.1 Stabilization + Adoption shipped and validated on 2026-04-17. Detailed requirement outcomes are archived in .planning/milestones/v1.1-REQUIREMENTS.md.

  • ✓ Minimal host-app dogfood harness exercises the real install and user-facing billing/admin paths — v1.1
  • ✓ CI runs the host-app integration and browser flows as a release gate — v1.1
  • ✓ Focused host-flow proofs are hermetic when run directly after the canonical host UAT wrapper — v1.1
  • ✓ Installer, docs, diagnostics, package metadata, and dependency-mode checks are hardened from the host-app experience — v1.1

v1.2 Adoption + Trust shipped and validated on 2026-04-17. Detailed requirement outcomes are archived in .planning/milestones/v1.2-REQUIREMENTS.md.

  • ✓ Phoenix developers can clone the repository, run the canonical local demo, create a Fake-backed subscription, inspect/replay billing state in admin, and run the focused proof suite without hidden state — v1.2
  • ✓ New users can follow a host-first tutorial and docs front door that explains integration order, supported public APIs, production hardening, and Fake/test/live Stripe choices — v1.2
  • ✓ Maintainers and adopters have mature OSS support assets, including issue templates and release guidance aligned with the established Accrue voice — v1.2
  • ✓ Security, performance, compatibility, accessibility/responsive behavior, and secret/PII safety have explicit checks or review artifacts before the next release — v1.2
  • ✓ Tax, revenue/export, additional processor, and organization/multi-tenant billing expansion options are researched and ranked for the next implementation milestone without changing the current billing API — v1.2

Validated v1.5 (archived in .planning/milestones/v1.5-REQUIREMENTS.md; milestone closed 2026-04-18)

  • PROOF-01 — VERIFY-01 / Fake CI cross-linked with Stripe test-mode parity lane; CI + guide naming clarity.
  • PROOF-02 — Host adoption proof matrix documents archetype coverage (including user billable ExUnit vs org-first LiveView).
  • PROOF-03 — Evaluator screen-recording checklist doc linked from host README.

Validated v1.6 (archived in .planning/milestones/v1.6-REQUIREMENTS.md; milestone closed 2026-04-20)

  • INV-01..03 — Admin route matrix, component coverage vs kitchen, Phase 20/21 spec alignment (Phase 25).
  • UX-01..04 — List/detail/webhook hierarchy and theme token discipline (Phase 26).
  • COPY-01..03 — Operator microcopy and stable literals via AccrueAdmin.Copy (Phase 27).
  • A11Y-01..04 — Focus, tables, contrast verification, mounted-admin axe in CI (Phase 28).
  • MOB-01..03 — Mobile overflow/nav and admin-heavy @mobile / chromium-mobile coverage (Phase 29).

Validated v1.7 (archived in .planning/milestones/v1.7-REQUIREMENTS.md; milestone closed 2026-04-21)

  • ADOPT-01..03 — Root README → VERIFY-01 within two hops; host README single proof subsection; guide cross-links (Phase 32).
  • ADOPT-04..06 — Installer rerun docs + anchors; doc contract coverage; merge-blocking vs advisory CI language (Phase 33).
  • OPS-01..03 — Operator home KPIs; customer→invoice drill; AccrueAdmin.Nav + README route inventory (Phase 34).
  • OPS-04..05 — Dashboard ax-* / token discipline; operator strings via AccrueAdmin.Copy + aligned Playwright (Phase 35).

Validated v1.8 (archived in .planning/milestones/v1.8-REQUIREMENTS.md; milestone closed 2026-04-22)

Theme: ORG-04 — non-Sigra org billing recipes, host integration depth, VERIFY/adoption-proof alignment; PROC-08 and FIN-03 not in this milestone.

  • ORG-05 — Single non-Sigra doc spine for session → billable + ORG-03 checklist (accrue/guides/organization_billing.md + cross-links). Validated in Phase 37.
  • ORG-06 — phx.gen.auth-oriented checklist in that spine (Accrue.Auth, Accrue.Billable, host billing facade). Validated in Phase 37.
  • ORG-07 — Pow-oriented recipe + honest maintenance notes. Validated in Phase 38.
  • ORG-08 — Custom org model checklist + ORG-03 anti-patterns. Validated in Phase 38.
  • ORG-09 — Adoption proof matrix ORG-09 section, merge-blocking bash verifier, contributor map, guide cross-links + ExUnit. Validated in Phase 39.

Validated v1.9 (milestone shipped 2026-04-22)

  • OBS-01, OBS-03, OBS-04guides/telemetry.md ops catalog + firehose split + gap audit reconciliation. Validated in Phase 40.
  • OBS-02, TEL-01MetricsOpsParityTest, cross-domain host subscription example in guide + examples/accrue_host. Validated in Phase 41.
  • RUN-01guides/operator-runbooks.md (Oban topology, Stripe verification pattern, four mini-playbooks) linked from guides/telemetry.md. Validated in Phase 42.

Validated v1.10 (archived in .planning/milestones/v1.10-REQUIREMENTS.md; milestone closed 2026-04-22)

Theme: usage metering + Fake parity + telemetry/docs alignment; PROC-08 and FIN-03 not in this milestone.

  • MTR-01..MTR-03 — Public report_usage API, meter event persistence semantics, Fake happy path. Validated in Phase 43.
  • MTR-04..MTR-06 — Sync failure + idempotent retry telemetry, reconciler recovery, webhook meter error path. Validated in Phase 44.
  • MTR-07..MTR-08 — Metering guide boundaries + telemetry/runbook alignment for meter_reporting_failed sources. Validated in Phase 45.

Validated v1.11 (archived in .planning/milestones/v1.11-REQUIREMENTS.md; milestone closed 2026-04-22)

Theme: Hex publish + post-release continuity (docs, verifiers, planning mirrors); PROC-08 and FIN-03 not in this milestone.

  • REL-01, REL-02, REL-04 — Maintainer release path, manifest/mix.exs SSOT, ship-time tag/Hex evidence. Validated in Phase 46.
  • REL-03 — Routine pre-1.0 linked-release narrative in RELEASING.md. Validated in Phase 47.
  • DOC-01, DOC-02first_hour.md install pins; verify_package_docs + ExUnit on main. Validated in Phase 47.
  • HYG-01 — Planning mirrors (PROJECT, MILESTONES, STATE) match published 0.3.0 pair. Validated in Phase 47.

Validated v1.12 (archived in .planning/milestones/v1.12-REQUIREMENTS.md; milestone closed 2026-04-22)

Theme: admin & operator UX (ADM-01..ADM-06); PROC-08 and FIN-03 not in this milestone.

  • ADM-01 — Default admin home shows a metering-credible terminal-failed MeterEvent KPI with honest /events navigation and AccrueAdmin.Copy SSOT. Validated in Phase 48.
  • ADM-02, ADM-03 — Scoped customer → subscription → invoice drill polish with honest links and LiveView tests; nav structure unchanged (D-08). Validated in Phase 49.
  • ADM-04SubscriptionLive operator chrome routed through AccrueAdmin.Copy / Copy.Subscription. Validated in Phase 50.
  • ADM-05 — Checked-in theme exception register + contributor PR checklist. Validated in Phase 50.
  • ADM-06 — Mounted-path inventory + VERIFY-01 expansion with Copy-derived Playwright assertions and mix accrue_admin.export_copy_strings anti-drift gate. Validated in Phase 50.

Validated v1.13 (archived in .planning/milestones/v1.13-REQUIREMENTS.md; milestone closed 2026-04-23)

Theme: integrator golden path + auxiliary admin parity; PROC-08 and FIN-03 not in this milestone.

  • INT-01..INT-03 — Single integrator spine (First Hourexamples/accrue_host) with H/M/R capsules; repo-root VERIFY-01 discoverability; troubleshooting anchor SSOT + bounded failure callouts. Validated in Phase 51.
  • INT-04 — Adoption proof matrix + evaluator walkthrough honesty vs golden path and CI lanes. Validated in Phase 52.
  • INT-05verify_package_docs, package READMEs, and ExDoc install snippets aligned with published Hex 0.3.0 pair. Validated in Phase 52.
  • AUX-01, AUX-02Coupons* / PromotionCode* operator strings via AccrueAdmin.Copy; tests avoid divergent literals on touched paths. Validated in Phase 52.
  • AUX-03, AUX-04Connect* / EventsLive meet the same copy + literal discipline. Validated in Phase 53.
  • AUX-05ax-* + theme tokens on touched auxiliary surfaces; exceptions recorded in theme-exceptions.md. Validated in Phase 53.
  • AUX-06 — VERIFY-01 Playwright + axe on materially touched auxiliary mounted paths; export_copy_strings / copy_strings.json anti-drift wiring. Validated in Phase 53.

Validated v1.15 (Phases 57–58; docs shipped 2026-04-23)

Theme: release / trust semantics (forcing function B); PROC-08 and FIN-03 not in this milestone.

  • TRT-01..TRT-04 — Hex + mix.exs baseline in upgrade.md; .planning/ vs SemVer in RELEASING.md + root README.md; Sigra vs Accrue.Auth + First Hour / organization billing pointers in examples/accrue_host/README.md; accrue/README.md stability + RELEASING appendix pointer; verify_package_docs aligned to accrue_admin/mix.exs. Validated in Phases 57–58.

Validated v1.16 (archived in .planning/milestones/v1.16-REQUIREMENTS.md; milestone closed 2026-04-23)

Theme: integrator + proof continuity after v1.15 trust SemVer work; PROC-08 and FIN-03 not in this milestone.

  • INT-06First Hour, quickstart, and CONTRIBUTING aligned with trust boundary + auth routing narrative; verify_package_docs enforces quickstart hub + capsule structure; merge-blocking doc trio green. Validated in Phase 59.
  • INT-07 — Adoption proof matrix + evaluator walkthrough trust stub + lane honesty; scripts/ci/README.md INT gates (INT-06/INT-07) with CONTRIBUTING routing. Validated in Phase 60.
  • INT-08 — Repo-root README preserves VERIFY-01 / host-integration discoverability within the documented hop budget; verifier + README updated together when the contract moves. Validated in Phase 61.
  • INT-09verify_package_docs, first_hour, package READMEs, and .planning/ Hex mirror callouts stay aligned with mix.exs @version on the branch under test. Validated in Phase 61.

Validated v1.17 (opened 2026-04-23; shipped 2026-04-23)

Theme: friction-led developer readiness — triage before broad doc sweeps; PROC-08 and FIN-03 not in this milestone.

  • FRG-01 — Ranked integrator-facing friction inventory committed under .planning/ (path recorded in .planning/STATE.md) with sources (e.g. VERIFY lanes, adoption matrix, host README, CI verifiers, maintainer notes) and explicit P0 / P1 / P2 + defer rows. Validated in Phase 62.
  • FRG-02North star + diminishing-returns stop rules for v1.17 documented and cross-linked from this Current milestone section (or STATE.md). Validated in Phase 62.
  • FRG-03Scoped implementation backlog for Phases 63–65 authored from FRG-01: each row either maps to INT-10 / BIL-03 / ADM-12 work or is deferred with written rationale (no hidden scope). Validated in Phase 62.
  • INT-10P0 integrator / VERIFY / docs closure — For every P0 backlog row tagged integrator, VERIFY, or docs, ship the fix (docs, verifiers, tests as needed) or downgrade to P1+ with maintainer rationale in the inventory doc; bash scripts/ci/verify_package_docs.sh and merge-blocking host-integration / VERIFY-01 contracts stay green on main after changes. Validated in Phase 63.
  • BIL-03P0 billing closure — For every P0 backlog row tagged billing, ship the bounded Accrue.Billing / Stripe / Fake work with regressions + guides/telemetry.md + CHANGELOG alignment or certify no P0 billing rows with signed rationale (no PROC-08). Validated in Phase 64.
  • ADM-12P0 admin / operator closure — For every P0 backlog row tagged admin, ship the scoped LiveView / AccrueAdmin.Copy / VERIFY-01 work or certify no P0 admin rows with signed rationale. Validated in Phase 65.

Validated v1.18 (archived in .planning/milestones/v1.18-REQUIREMENTS.md; milestone closed 2026-04-23)

Theme: Onboarding confidence — deferred Phase 62 human UAT baseline + evaluator proof alignment; PROC-08 and FIN-03 not in this milestone.

  • UAT-01..UAT-05 — Friction inventory / STATE / north-star / archive / ROADMAP consistency with 66-VERIFICATION.md + verify_v1_17_friction_research_contract.sh where cited. Validated in Phase 66.
  • PROOF-01 — Adoption proof matrix, evaluator walkthrough, verify_adoption_proof_matrix.sh, host README, and org matrix ExUnit stay aligned. Validated in Phase 66.

Validated v1.21 (Phases 72–73 complete)

Theme: maintenance posture + contributor capsule parity; PROC-08 and FIN-03 not in this milestone.

  • MAT-01.planning/PROJECT.md library maintenance posture (FRG-01 intake, revisit triggers) with links to north star, friction inventory, production-readiness.md, maturity-and-maintenance.md. Validated in Phase 72.
  • MAT-02accrue/guides/maturity-and-maintenance.md + cross-links from First Hour, production-readiness, CONTRIBUTING. Validated in Phase 72.
  • INT-11scripts/ci/README.md same-PR checklist (First Hour H/M/R ↔ host README); v1.17-P2-001 closed in friction inventory. Validated in Phase 73.

Validated v1.23 (Phase 75; milestone closed 2026-04-24)

Theme: post-publish contract alignment (PPX-01..04); PROC-08 and FIN-03 not in this milestone. Archive: .planning/milestones/v1.23-REQUIREMENTS.md.

  • PPX-01verify_package_docs.sh + package_docs_verifier_test.exs aligned with workspace @version at 0.3.1 after linked publish. Validated in Phase 75.
  • PPX-02verify_adoption_proof_matrix.sh + adoption matrix needle discipline. Validated in Phase 75.
  • PPX-03 — Merge-blocking docs-contracts-shift-left (including verify_production_readiness_discoverability.sh) green after doc/version touches. Validated in Phase 75.
  • PPX-04.planning/ public-Hex callouts + v1.17-P1-002 closed with 75-VERIFICATION pointer. Validated in Phase 75.

Validated v1.24 (Phases 76–78; planning milestone complete 2026-04-24)

Theme: billing portal facade + customer PM operator surfaces (ADM-13..16, BIL-04..05). PROC-08 / FIN-03 not in this milestone.

  • ADM-13, ADM-14 — Customer payment_methods tab inventory + AccrueAdmin.Copy burn-down. Validated in Phase 76 (76-VERIFICATION.md).
  • ADM-15 — Merge-blocking VERIFY-01 Playwright + axe for customer detail ?tab=payment_methods (examples/accrue_host); matrix row in verify01-v112-admin-paths.md. Validated in Phase 77 (77-VERIFICATION.md).
  • ADM-16accrue_admin/guides/theme-exceptions.md Phase 77 reviewer note; mix accrue_admin.export_copy_strings SSOT for copy_strings.json; closure in milestones/v1.24-phases/77-customer-pm-tab-verify-theme-copy-export/77-VERIFICATION.md. Validated in Phase 77.
  • BIL-04Accrue.Billing.create_billing_portal_session/2 (+ !) with span_billing(:billing_portal, :create, …), Fake-backed ExUnit. Validated in Phase 78 (78-VERIFICATION.md).
  • BIL-05guides/telemetry.md, operator-runbooks.md, CHANGELOG.md aligned with billing portal + payment-method span inventory. Validated in Phase 78 (78-VERIFICATION.md).

Validated v1.25 (archived in .planning/milestones/v1.25-REQUIREMENTS.md; milestone closed 2026-04-24)

  • INV-03 — Maintainer pass path (b) on v1.17-FRICTION-INVENTORY.md with 079-VERIFICATION.md verifier evidence. Validated in Phase 79 (079-VERIFICATION.md under milestones/v1.25-phases/).
  • BIL-06Accrue.Billing.create_checkout_session/2 (+ !) with span_billing(:checkout_session, :create, …), allowlisted checkout telemetry metadata, Fake-backed checkout_session_facade_test.exs. Validated in Phase 80 (080-VERIFICATION.md under milestones/v1.25-phases/).
  • BIL-07guides/telemetry.md + operator-runbooks.md checkout span catalog / triage pointer; CHANGELOG. Validated in Phase 81 (081-VERIFICATION.md under milestones/v1.25-phases/).
  • INT-12First Hour, examples/accrue_host README, adoption proof matrix + verify_package_docs.sh / verify_adoption_proof_matrix.sh needles for create_checkout_session. Validated in Phase 81 (081-VERIFICATION.md under milestones/v1.25-phases/).

Validated v1.27 (archived in .planning/milestones/v1.27-REQUIREMENTS.md; milestone closed 2026-04-24)

  • CLS-01..03 — Pre-1.0 closure narrative on repo root README.md, accrue/README.md, RELEASING.md, accrue/guides/upgrade.md. Validated in Phase 84 (084-VERIFICATION.md under milestones/v1.27-phases/).
  • INV-05 — Post-CLS maintainer pass path (b) on v1.17-FRICTION-INVENTORY.md with 085-VERIFICATION.md transcripts. Validated in Phase 85 (085-VERIFICATION.md under milestones/v1.27-phases/).

Validated v1.26 (archived in .planning/milestones/v1.26-REQUIREMENTS.md; milestone closed 2026-04-24)

  • INT-13create_billing_portal_session on First Hour + host README + adoption matrix + merge-blocking verifier needles (telemetry anchor #billing-billing-portal-create). Validated in Phase 82 (082-VERIFICATION.md under milestones/v1.26-phases/).
  • INV-04 — Post-INT-13 maintainer pass path (b) on v1.17-FRICTION-INVENTORY.md with 083-VERIFICATION.md transcripts. Validated in Phase 83 (083-VERIFICATION.md under milestones/v1.26-phases/).

Validated v1.20 (Phases 70–71 complete)

  • INV-01 — Post–0.3.1 friction inventory pass: v1.17-P1-001 closed in .planning/research/v1.17-FRICTION-INVENTORY.md with v1.19 PRF evidence pointers. Validated in Phase 70.
  • INV-02 — Dated maintainer note + revisit trigger when no new sourced P0/P1 rows warranted. Validated in Phase 70.
  • PRD-01accrue/guides/production-readiness.md checklist spine (links to existing guides only). Validated in Phase 71.
  • PRD-02 — Cross-links from First Hour, configuration, and examples/accrue_host README. Validated in Phase 71.

Validated v1.19 (Phases 67–69 complete)

  • PRF-01 — Merge-blocking verify_adoption_proof_matrix.sh needles track adoption-proof-matrix.md Layer C script names (including verify_core_admin_invoice_verify_ids.sh) plus ORG-05 / ORG-06 taxonomy tokens alongside existing ORG-09 archetype needles (addresses v1.17-P1-001). Validated in Phase 67.
  • PRF-02scripts/ci/README.md triage subsection documents matrix SSOT path, docs-contracts-shift-left, same-PR co-update rule for matrix + script + ExUnit literal harness (organization_billing_org09_matrix_test.exs), and a repo-relative matrix link. Validated in Phase 67.
  • REL-01..REL-03RELEASING.md default merge + ordered Hex publish narrative; ship-boundary changelog expectations; Hex + tag + changelog-at-tag evidence in 68-VERIFICATION.md. Validated in Phase 68.
  • DOC-01..DOC-02first_hour, package README ~> pins, verify_package_docs.sh, and package_docs_verifier_test.exs aligned with mix.exs @version; proof in 69-VERIFICATION.md. Validated in Phase 69.
  • HYG-01PROJECT.md, MILESTONES.md, and STATE.md public-Hex / 0.3.1 callouts consistent with shipped mix.exs pair. Validated in Phase 69.

Validated v1.14 (Phases 54–56; milestone scope delivered 2026-04-23)

Theme: core admin parity + one billing / Stripe read slice; PROC-08 and FIN-03 not in this milestone.

  • ADM-07..ADM-11 — Core admin inventory (54), money-primary burn-down (54), VERIFY-01 + theme exceptions + copy export hygiene on invoice flows (55). Validated in Phases 54–55.
  • BIL-01, BIL-02list_payment_methods on Accrue.Billing with Fake coverage; telemetry guide + changelog + installer host stub + First Hour pointer (56). Validated in Phase 56.

Validated v1.4 (archived here; milestone closed 2026-04-17)

  • STAB-01 — Latest published lattice_stripe compatible with ~> 1.1 across monorepo lockfiles; gates green.
  • UX-DEMO-01 — Visual walkthrough docs + optional npm run e2e:visuals for the Phase 15 trust Playwright path.

Validated v1.3 (archived)

v1.3 Tax + Organization Billing shipped and validated on 2026-04-17. Outcomes: .planning/milestones/v1.3-REQUIREMENTS.md.

  • ✓ TAX-01 through TAX-04 — Phases 18–19
  • ✓ ORG-01 through ORG-03 — Phase 20
  • ✓ VERIFY-01 — Phases 21–22 (executable proof + finance handoff narrative)
  • ✓ FIN-01 and FIN-02 — Phase 22 (accrue/guides/finance-handoff.md)

Validated v1.0 Scope Summary

Core billing domain

  • Polymorphic Accrue.Billing.Customer — any host schema (User, Org, Team) can be billable via use Accrue.Billable
  • Accrue.Billing.Subscription with full lifecycle (trials, proration, pause/resume, swap, cancel-at-period-end, immediate cancel, dunning, grace periods)
  • Accrue.Billing.Invoice with draft/open/paid/void/uncollectible state machine, line items, discounts, tax
  • Accrue.Billing.Charge / PaymentIntent / SetupIntent wrappers with async-state handling (requires_action, 3DS/SCA)
  • Accrue.Billing.PaymentMethod with default-management, fingerprinting
  • Accrue.Billing.Refund with Stripe fee awareness (gotcha #14)
  • Accrue.Billing.Coupon / PromotionCode / gift card redemption
  • Free-tier / trial / comped subscription support (no PaymentMethod required)
  • Multi-currency (including zero-decimal currency safety — JPY/KRW etc)
  • Subscription Schedules for multi-phase billing
  • Customer Portal Session + Checkout Session helpers
  • Stripe Connect (Standard/Express/Custom) support for marketplaces: destination charges, separate charges + transfers, platform onboarding

Processor abstraction

  • Stripe processor (via lattice_stripe dep)
  • Fake processor for test-first development (no Stripe API calls, test clock, time advancement, event triggering)
  • Accrue.Processor behaviour designed so future adapters (Paddle, Lemon Squeezy, Braintree) can implement it without false-parity abstraction over processor-specific capabilities

Webhooks

  • Raw-body capture Plug (mandatory before Plug.Parsers)
  • Signature verification
  • DB idempotency via accrue_webhook_events table with UNIQUE(processor_event_id)
  • Oban-backed async dispatch with exponential backoff retry, dead-letter after N attempts
  • User handler contract with pattern-matchable event types
  • Replay tooling (requeue failed / dead-lettered events)

Event ledger

  • Append-only accrue_events table, immutable at the Postgres role/trigger level
  • Transactional event recording alongside state mutations (atomicity guarantee)
  • schema_version inside data jsonb + upcaster pattern for evolution
  • OpenTelemetry trace_id correlation per event
  • Query API: timeline for subject, replay/rewind state as-of, analytics bucketing
  • Bridge to Sigra.Audit when sigra adapter is active

Email

  • Swoosh-based transactional email via Accrue.Mailer facade (behaviour-wrapped so library doesn't leak Swoosh to users)
  • Full email type set: receipt, payment_succeeded, payment_failed, trial_ending, trial_ended, invoice_finalized, invoice_paid, invoice_payment_failed, subscription_canceled, subscription_paused, subscription_resumed, refund_issued, coupon_applied, gift_sent, gift_redeemed
  • HEEx templates that work in plain-text AND HTML, rendering consistently across major email clients
  • Single-point branding config (logo, colors, from-name, from-address) for 80% case
  • Per-template override for full customization
  • MJML support via mjml_eex for responsive templates

PDF

  • Accrue.PDF behaviour with Accrue.PDF.ChromicPDF default adapter, Accrue.PDF.Test for assertion-based testing, documented path for custom adapters (Gotenberg sidecar, external services)
  • Branded invoice PDFs from the same HEEx template that drives the email HTML body (single source of truth)
  • Attachment and download paths for generated PDFs

Admin UI (companion package accrue_admin)

  • Phoenix LiveView dashboard: customers, subscriptions, invoices, charges, coupons, webhook events
  • Mobile-first responsive layout
  • Light + dark mode
  • Default theme follows Accrue brand palette (Ink / Slate / Fog / Paper foundation + Moss / Cobalt / Amber accents)
  • Branding customization (logo, accent color, app name) for internal-tool style
  • Webhook event inspector with raw payload, status, retry history, one-click replay, dead-letter bulk requeue
  • Activity feed sourced from accrue_events
  • Auth protection via Accrue.Auth adapter (Sigra-auto-wired when present)
  • Released same day as accrue v1.0, from the same monorepo

Auth integration

  • Accrue.Auth behaviour (current_user, require_admin_plug, user_schema, log_audit, actor_id)
  • Accrue.Auth.Default fallback adapter
  • Accrue.Integrations.Sigra first-party adapter, conditionally compiled, auto-detected by installer
  • Documented path for community adapters (Accrue.Integrations.PhxGenAuth, .Pow, .Assent)

Install + DX

  • mix accrue.install task that generates migrations, MyApp.Billing context, router mounts, admin LiveView routes; detects sigra and auto-wires auth; uses configurable billable schema
  • Discoverable, intuitive configuration with NimbleOptions-backed validation and doc generation
  • Accrue.Billing context facade hides lattice_stripe from the user-facing API

Observability

  • First-class :telemetry events with consistent [:accrue, :domain, :action, :start|:stop|:exception] naming
  • OpenTelemetry span helpers with business-meaningful attributes (customer_id, subscription_id, event_type, processor)
  • High-signal ops events for SRE/on-call (revenue-loss, webhook DLQ, dunning exhaustion) with low-signal firehose available separately
  • Structured, pattern-matchable error hierarchy (Accrue.ErrorAccrue.CardError, .RateLimitError, etc.)

Testing

  • Fake Processor as the primary test surface — not an afterthought
  • Test helpers: time advancement, event triggering, state inspection, assert_email_sent, assert_pdf_rendered
  • Mock adapters for Accrue.Auth, Accrue.Mailer, Accrue.PDF so host apps can test billing flows without hitting Stripe / Chrome / real SMTP

OSS hygiene and release

  • Monorepo with sibling mix projects (accrue/, accrue_admin/), each published independently to Hex
  • GitHub Actions CI: Elixir/OTP matrix, mix format --check-formatted, mix compile --warnings-as-errors, mix test --warnings-as-errors, mix credo --strict, mix dialyzer, mix docs --warnings-as-errors, mix hex.audit
  • Release Please + Conventional Commits for automated version bumps + CHANGELOG
  • ExDoc with guides: quickstart, configuration, testing, Sigra integration, custom processors, custom PDF adapter, brand customization, admin UI setup, upgrade guide
  • MIT license, single-root LICENSE file, no CLA
  • CONTRIBUTING.md, CODE_OF_CONDUCT.md (Contributor Covenant 2.1), SECURITY.md for vulnerability disclosure
  • Semantic versioning with documented deprecation policy; minimize breaking changes through v1.x via stable public API facade

Out of Scope

  • MVP / iterate-in-public release strategy — user wants the first public release to be fully complete; no v0.1→v0.2→v0.3 cadence. Phases in this project are internal build milestones, not public releases.
  • Multi-provider at launch — Stripe-only for v1.0. Processor behaviour is designed to support future adapters (Paddle, Lemon Squeezy, Braintree), but building those actual adapters is post-1.0. If existing Elixir libs exist for other processors they can be wrapped later; if not, those libraries will be built separately in future Jon-owned projects.
  • Multi-database support — PostgreSQL 14+ only. MySQL and SQLite lose too many load-bearing features (jsonb/GIN, partial indexes, unique-where, advisory locks, exclusion constraints). Revisit only if real user demand emerges post-1.0, using Oban's multi-engine playbook.
  • Dual-license / commercial tier at launch — MIT only for v1.0. Future commercial paths go through vertical integration (hosted service, compliance/tax bundling) rather than paid features in the core library.
  • Full CQRS/Event Sourcing via Commanded — rejected in favor of append-only audit log pattern. Commanded is mature but wrong abstraction for billing, which Stripe itself models as mutable state + event notifications.
  • Accrue owning the auth user schema — Accrue's polymorphic owner_type/owner_id references host-owned schemas (via sigra, phx.gen.auth, Pow, or other). Accrue never owns users.
  • First-party Paddle/Lemon Squeezy/Braintree adapters — post-1.0.
  • Revenue recognition / GAAP accounting — out of scope; Accrue is a billing/subscription library, not an accounting system. Users integrate downstream accounting tools themselves.
  • Tax calculation — out of scope for v1.0; users can surface Stripe Tax through Accrue's existing APIs, but no first-party tax resolution/compliance support at launch.

Context

Ecosystem gap. Elixir/Phoenix has no mature billing library in 2026. Bling is pre-1.0 with single-maintainer risk and depends on stripity_stripe pinned to a 2019 API. The Phoenix community has paid a real cost for this gap — Rails has Pay + Jumpstart, Laravel has Cashier + Spark, Django has dj-stripe. Accrue fills that niche with the benefit of those libraries' lessons learned.

Lessons learned from prior art (extracted from Pay/Cashier/dj-stripe research):

  • Pay v2→v3 migration pain — moving from User-table columns to separate polymorphic tables broke many users. Accrue starts polymorphic from day one.
  • Cashier's separate-package decision — shared multi-processor abstraction is a beautiful lie; Laravel explicitly split Stripe and Paddle into separate packages because generic abstraction failed. Accrue ships Stripe-first and resists false parity.
  • dj-stripe's JSON blob strategy — after a decade, dj-stripe converged on storing full Stripe API responses in data columns rather than maintaining 1:1 column parity. Accrue adopts this from day one.
  • Webhook handling is the #1 value-add — every ecosystem's users cite it as the highest-ROI feature a billing lib can provide. Accrue makes it a first-class citizen.
  • The Fake Processor is table stakes, not an edge case — Pay's fake processor transforms the test story from "slow, flaky, expensive" to "fast, reliable, local". Accrue builds it on day one as the primary test surface.
  • Raw-body gotcha — most web frameworks (Phoenix included) parse bodies before handler runs, destroying the raw bytes needed for webhook signature verification. This is the single most common webhook integration bug. Accrue provides the plug that solves it.

Sibling projects (same author: Jon):

  • lattice_stripe (/Users/jon/projects/lattice_stripe, v0.2.0, Stripe API 2026-03-25.dahlia) — thin Elixir wrapper over the Stripe SDK. Covers Tier 1–2 (payments, customers, payment methods, refunds, checkout, webhooks, errors, telemetry). Accrue depends on it directly. Gap: no Billing (Subscription/Product/Price/Invoice/Meter) coverage yet — Accrue will need lattice_stripe to add these, or build them upstream as lattice_stripe contributions. Also lacks v2 include support, Connect context helpers, and event type constants.
  • sigra (/Users/jon/projects/sigra, v0.1.0) — authentication library for Phoenix 1.8+, "Devise with lessons learned." Hybrid lib + generator pattern (security-critical code in lib, schemas/contexts/routes generated into host). Local Sigra now ships logical multi-tenancy through organizations, memberships, invitations, active organization scope/session hydration, tenant-aware audit columns, org-aware admin, impersonation, and audit/export surfaces. Accrue's Accrue.Integrations.Sigra adapter plugs into it, and v1.3 should use Sigra-first examples while keeping generic host-owned billables supported.

Brand (from prompts/accrue brand book.md):

  • Positioning: Elixir-native, framework-integrated, not a fintech. Calm, measured, technically precise.
  • Tagline: "Billing state, modeled clearly."
  • Palette: Ink #111418, Slate #24303B, Fog #E9EEF2, Paper #FAFBFC foundation; Moss #5E9E84 primary; Cobalt #5D79F6 interactive; Amber #C8923B warnings/grace periods.
  • Typography: neutral sans (Inter/Geist/IBM Plex Sans), JetBrains/IBM Plex Mono for code and event labels.
  • Visual vocabulary: stacked lines, offset blocks, timelines, state diagrams. No coin/card/wallet clichés.
  • Messaging pillars: native to Phoenix, billing as queryable app state (not black-box remote calls), webhooks without chaos, good open-source taste.

Philosophy:

  • Idiomatic Elixir/OTP: pure functions at core, processes only for real state/concurrency, {:ok, result} | {:error, exception} returns with bang variants, behaviours for real extension points, protocols for data-type polymorphism, no macro abuse.
  • Idiomatic Ecto: thin schemas, context functions as public API, explicit preloads, database-enforced integrity, Ecto.Multi for dynamic multi-step writes, Repo.transact for linear, schemas have redact: true on sensitive fields.
  • Idiomatic Phoenix: business logic in MyApp.Billing context, web code in MyAppWeb, LiveView function components with attr/slot, ~p verified routes, authz on action not just mount, Phoenix optional-not-required for headless core.
  • OSS hygiene: small public API, layered façade, clear namespace (Accrue.*), runtime options over app env, first-class telemetry, exception hierarchy, ExDoc guides for every non-trivial topic.
  • DDD-respecting: Accrue and its admin UI stay inside a Billing context so they don't pollute the host app's core domain(s). Same principle Sigra applies to authentication.

Constraints

  • Tech stack: Elixir 1.17+, OTP 27+, Phoenix 1.8+, Ecto 3.12+, PostgreSQL 14+. No legacy OTP support.
  • Dependencies (required): lattice_stripe (Stripe calls), oban (webhook async + email async + scheduled jobs), swoosh (email), ecto_sql, postgrex, nimble_options (config validation), telemetry, chromic_pdf (default PDF adapter — pullable via accrue_admin and core).
  • Dependencies (optional): sigra (optional: true), phoenix_live_view (hard dep in accrue_admin, not in core).
  • Release model: ship complete. No public v0.x iteration cycle. Internal phases are build milestones, not public releases. First public release is v1.0 (or 0.1.0 if strict semver-pre-1 is preferred, but conceptually "complete").
  • Compatibility: Phoenix 1.8+, LiveView 1.0+. No attempt at backward compatibility with Phoenix 1.7 or earlier.
  • Security: Webhook signature verification mandatory and non-bypassable. Raw-body plug must run before Plug.Parsers. Sensitive Stripe fields never logged. Payment method details stored as Stripe references, never as PII.
  • Performance: webhook request path <100ms p99 (verify → persist → enqueue → 200); async handler latency budget set by Oban queue config, user-configurable.
  • Observability: all public entry points emit :telemetry start/stop/exception events. OTel span helpers available for every Billing context function.
  • Monorepo: accrue/ and accrue_admin/ as sibling mix projects in one git repo. Shared .github/workflows/, shared guides/, per-package mix.exs, CHANGELOG.md per package.
  • License: MIT for both packages.

Key Decisions

Decision Rationale Outcome
Stripe-only for v1.0 (processor behaviour designed for future adapters) False multi-processor parity was Laravel Cashier's most-cited regret; lessons learned dominate breadth ✓ Good
Polymorphic billable (owner_type/owner_id) + use Accrue.Billable macro Pay v2→v3 migration pain; future sigra org support flows through with zero schema churn ✓ Good
PostgreSQL 14+ only 7 load-bearing PG features have no clean fallback; ~0% of serious Phoenix apps use MySQL/SQLite in production ✓ Good
Hybrid lib + mix accrue.install generator Matches sigra's pattern, upgrade-safe, best install DX; Phoenix community already knows this shape via phx.gen.auth ✓ Good
Admin UI as companion accrue_admin package (monorepo, same-day release) Core stays LiveView-free for headless users; phoenix_live_dashboard / oban_web pattern is idiomatic ✓ Good
Swoosh (wrapped behind Accrue.Mailer facade) Phoenix default since 1.6, larger adapter catalog, better test ergonomics, ecosystem alignment ✓ Good
PDF via Accrue.PDF behaviour + ChromicPDF default Seam pays for itself on the testing story alone (no Chrome in tests); escape hatch for Chrome-hostile deploys comes free ✓ Good
Oban-backed async webhook dispatch (Oban required dep) Retries survive deploys, DB idempotency at layer boundary, Oban is THE Elixir job standard, already needed for async email ✓ Good
Accrue.Auth behaviour + Accrue.Integrations.Sigra adapter Centralizes 15+ integration points to one dispatch, matches Plug/Ecto/Swoosh idiom, path for community adapters ✓ Good
Append-only accrue_events table + Sigra.Audit bridge (NOT Commanded) Matches Stripe's mental model (mutable state + events), ~150 LOC vs ~600+ for CQRS, transactional atomicity via Postgres ✓ Good
MIT license, no CLA, single LICENSE file Matches Elixir ecosystem norm; future commercial path via services not dual-license ✓ Good
Context name MyApp.Billing Industry-standard term, matches Stripe product naming, covers subs + one-time + refunds cleanly ✓ Good
Build complete, ship v1.0 (no MVP-iterate cadence) User explicit: won't have real users until fully usable; avoids Pay-style v2→v3 migration pain for early adopters ✓ Good
Dogfood through a real Phoenix host app before broader adoption work Real install, auth, webhook, admin, and clean-checkout paths exposed integration gaps that package-local tests could not catch ✓ Good
Make Fake-backed host browser flow mandatory and live Stripe advisory Deterministic CI should block regressions while live Stripe remains useful but non-deterministic ✓ Good
Move host UI reads through generated MyApp.Billing facade First-user docs should teach host-owned public boundaries, not private Accrue table queries ✓ Good
Treat adoption, quality, and expansion as next-milestone candidates after stabilization The v1.1 audit validated HOST/CI/DX scope; remaining ADOPT/QUAL/DISC ideas need fresh prioritization instead of automatic carryover ✓ Good
v1.2 focuses on Adoption + Trust before large feature expansion The biggest remaining gap is confidence for new users evaluating a billing library, not another core billing primitive; polish should stop once it hits diminishing returns and expansion should be decided deliberately ✓ Good
Keep v1.2 expansion to discovery only Tax, revenue exports, processors, and org billing are likely next-level features, but partial implementation would distract from onboarding and trust hardening ✓ Good
Record the Phase 16 ranking as recommendation-only planning guidance Stripe Tax support is the recommended Next milestone; Organization / multi-tenant billing and Revenue recognition / exports remain Backlog; Official second processor adapter remains a Planted seed, and no v1.2 billing API, schema, or processor-abstraction implementation is implied ✓ Good
v1.3 combines Stripe Tax with Sigra-first organization billing and finance handoff Stripe Tax is still the safest first expansion; Sigra org support is now concrete enough for host-proofed org billing; finance should stay Stripe-native before Accrue owns accounting semantics ✓ Good
v1.6 closes admin UX polish without new billing primitives Operator trust (a11y, mobile, copy) advances adoption without PROC-08/FIN-03 scope creep ✓ Good
Post-ship Phases 30–31 close audit corpus + advisory integration without Hex release churn Keeps evaluator-facing proof contracts aligned while preserving existing v1.6 tag semantics ✓ Good
v1.7 combines adoption/DX with operator admin depth without billing primitive expansion After v1.6 polish, the highest leverage is clearer VERIFY-01 + install/docs matrices plus intentional admin entry flows—not PROC/FIN/ORG scope creep ✓ Good
v1.8 delivers ORG-04 after Sigra-first org proof Non-Sigra teams need first-class recipes and proof that ORG-03 boundaries hold; scope stays docs + host patterns + VERIFY alignment—no PROC-08/FIN-03 ✓ Good
v1.9 prioritizes observability + runbooks before meter milestone Post–v1.8 plan: telemetry discoverability and ops runbooks maximize adoption ROI; metered billing (v1.10+) follows with Fake parity ✓ Good
v1.10 delivers metered usage with Fake parity before second processor Usage reporting, outbox, reconciler, and webhook error paths must be host-testable on Fake with stable telemetry keys; PROC-08 stays out of scope ✓ Good
v1.11 ships Hex before the next feature milestone Evaluators and hosts need published packages that include metering + accumulated work; release automation and doc verifiers must stay aligned with linked-versions monorepo reality ✓ Good
v1.12 extends companion admin without billing-primitive expansion Operators need post-metering admin clarity and smoother drills on Hex 0.3.0; scope stays presentation + gates—not PROC-08 / FIN-03 ✓ Good
v1.13 pairs integrator golden-path docs with auxiliary admin parity First-time hosts still judge the library on README ↔ first_hour ↔ VERIFY-01 coherence; secondary LiveViews must not feel “unshipped” next to customers/subscriptions/invoices ✓ Good
v1.14 sequences core admin parity before integrator/Hex milestones After auxiliary parity (v1.13), core money flows should meet the same Copy/token/VERIFY bar; one billing depth slice ships with Fake + telemetry truth before doc/release milestones return ✓ Good — shipped Phases 54–56 (2026-04-23); tag v1.14
v1.15 prioritizes release/trust semantics (forcing function B) over feature expansion Pre-1.0 Hex + internal v1.x planning labels risk evaluator confusion; fix with docs + demo README clarity before further polish milestones ✓ Good — shipped Phases 57–58 (2026-04-23); archived + planning tag v1.15
v1.16 closes integrator/proof continuity deferred from v1.14–v1.15 Trust SemVer messaging and v1.13 INT baseline can drift; explicit milestone re-binds golden path, matrix, root VERIFY hops, and package-doc SSOT without billing scope creep ✓ Good — shipped Phases 59–61 (2026-04-23); archived + planning tag v1.16
v1.17 uses friction triage before broad doc sweeps After v1.16 continuity, ranked FRG-01 evidence + FRG-03 backlog prevents silent scope expansion; BIL-03/ADM-12 allow signed empty-queue certification ✓ Good — shipped Phases 62–65 (2026-04-23); archived + planning tag v1.17
v1.18 closes deferred 62-UAT confidence with a verification ledger + contracts Proof-first slice: REQUIREMENTS normative over historical 62-UAT body; thin bash/ExUnit for binary invariants; PROOF-01 keeps matrix ↔ script ↔ README honest ✓ Good — shipped Phase 66 (2026-04-23); archived + planning tag v1.18
v1.19 sequences proof-contract hardening before 0.3.1 Hex publish Workspace @version already 0.3.1 while public Hex lags 0.3.0; PRF- work closes v1.17-P1-001 drift class before release train; HYG mirrors follow ship ✓ Good — shipped Phases 67–69 (2026-04-24); archived + planning tag v1.19
v1.20 closes friction evidence loop + production readiness spine without billing scope Post–0.3.1 inventory pass (INV-) + production-readiness.md integrator cross-links (PRD-); PROC-08 / FIN-03 unchanged ✓ Good — shipped Phases 70–71 (2026-04-24); archived + planning tag v1.20
v1.21 codifies maintenance posture + capsule parity without billing scope MAT- docs + INT-11 checklist close v1.17-P2-001; evidence-gated friction intake explicit for maintainers ✓ Good — shipped Phases 72–73 (2026-04-23); archived + planning tag v1.21
v1.22 makes production-readiness discoverability merge-blocking After maintenance posture, root + package README still hid the ship checklist; PRS- ties evaluator path to §1–§10 spine without billing primitive expansion ✓ Good — shipped Phase 74 (2026-04-24); archived + planning tag v1.22
v1.23 re-verifies publish-adjacent contracts at 0.3.1 After v1.19 publish + v1.22 discoverability, PPX- closes v1.17-P1-002 with full docs-contracts-shift-left + friction-inventory alignment ✓ Good — shipped Phase 75 (2026-04-24); archived + planning tag v1.23
v1.24 ships billing portal facade on Accrue.Billing + customer PM admin parity After v1.23 contract pass, bounded BIL-04..05 + ADM-13..16 close operator trust on portal entry + payment_methods without PROC-08 / FIN-03 ✓ Good — shipped Phases 76–78 (2026-04-24); archived + planning tag v1.24
v1.25 sequences friction maintainer pass + integrator contracts + checkout on Accrue.Billing After v1.24, keep FRG-01 honest, PPX-adjacent proof/docs aligned, and mirror BIL-04 facade patterns for Stripe Checkout via Accrue.Checkout.Session — still no PROC-08 / FIN-03 ✓ Good — shipped Phases 79–81 (2026-04-24); milestones/v1.25-* + v1.25-phases/; tag v1.25
v1.26 extends INT-12 class proof to billing portal on golden-path surfaces After v1.25 checkout spine, INT-13 + INV-04 keep First Hour / matrix / friction SSOT honest without new Accrue.Billing APIs ✓ Good — shipped Phases 82–83 (2026-04-24); milestones/v1.26-* + v1.26-phases/; tag v1.26
v1.27 states pre-1.0 closure posture on integrator + release docs and re-certifies friction inventory After v1.26, CLS- narrative + INV-05 dated pass keep FRG-02 / S5 honest without PROC-08 / FIN-03 ✓ Good — shipped Phases 84–85 (2026-04-24); milestones/v1.27-* + v1.27-phases/; tag v1.27
v1.28 sequences next linked publish contracts + INV-06 inventory pass After v1.27, spine B — event-driven PPX-05..08 on registry bump + INV-06 per inventory triggers — avoids speculative milestones without publish forcing function ✓ Good — planning complete Phases 86–87 (2026-04-24); 086-VERIFICATION.md, 087-VERIFICATION.md; REQUIREMENTS.md

Current Milestone Notes

  • 2026-04-24: /gsd-new-milestone (plan implementation)v1.28 Next linked publish continuity (strategic spine B); REQUIREMENTS.md (PPX-05..08, INV-06); roadmap Phases 86–87; domain research skipped (brownfield v1.23 pattern).
  • 2026-04-24: /gsd-new-milestone (closure)v1.27 Pre-1.0 closure narrative; REQUIREMENTS.md (CLS-01..03, INV-05); roadmap Phases 84–85; domain research skipped (maintainer narrative + inventory pass).
  • 2026-04-24: /gsd-complete-milestone v1.27 — archives milestones/v1.27-*, git rm .planning/REQUIREMENTS.md for next milestone, planning tag v1.27; audit-open all clear (no v1.27-MILESTONE-AUDIT.md); ROADMAP v1.27 <details> updated to archived requirements links.
  • 2026-04-24: /gsd-complete-milestone v1.26 — archives milestones/v1.26-*, git rm .planning/REQUIREMENTS.md for next milestone, planning tag v1.26; audit-open all clear; ROADMAP v1.26 <details> updated to archived requirements links.
  • 2026-04-24: /gsd-complete-milestone v1.25 — archives milestones/v1.25-*, git mv Phases 79–81milestones/v1.25-phases/, git rm .planning/REQUIREMENTS.md for next milestone, planning tag v1.25; audit-open all clear; 081-01-SUMMARY.md backfilled.
  • 2026-04-24: /gsd-new-milestone v1.25Evidence-bound triad; domain research completed under .planning/research/ before REQUIREMENTS.md / ROADMAP.md; v1.24 phase trees live under milestones/v1.24-phases/.
  • 2026-04-24: /gsd-execute-phase 79INV-03 path (b); ### v1.25 INV-03 maintainer pass (2026-04-24) in v1.17-FRICTION-INVENTORY.md + 079-VERIFICATION.md.
  • 2026-04-24: /gsd-complete-milestone v1.24 — archives milestones/v1.24-*, git rm .planning/REQUIREMENTS.md for next milestone, planning tag v1.24 (no standalone v1.24-MILESTONE-AUDIT.md; audit-open clear).
  • 2026-04-24: /gsd-complete-milestone v1.23 — archives milestones/v1.23-*, git rm .planning/REQUIREMENTS.md for next milestone, planning tag v1.23.
  • 2026-04-24: /gsd-complete-milestone v1.22 — archives milestones/v1.22-*, git rm .planning/REQUIREMENTS.md for next milestone, planning tag v1.22.
  • 2026-04-23: /gsd-new-milestone v1.22Production path discoverability; REQUIREMENTS.md (PRS-01..03); verify_production_readiness_discoverability.sh + docs-contracts-shift-left; roadmap Phase 74.
  • 2026-04-23: /gsd-complete-milestone v1.21 — archives milestones/v1.21-*, git rm .planning/REQUIREMENTS.md for next milestone, planning tag v1.21.
  • 2026-04-24: /gsd-complete-milestone v1.20 — archives milestones/v1.20-*, git mv Phases 70–71milestones/v1.20-phases/, git rm .planning/REQUIREMENTS.md for next milestone, planning tag v1.20.
  • 2026-04-23: /gsd-new-milestone v1.19Release continuity + proof resilience; REQUIREMENTS.md (PRF-01..02, REL-01..03, DOC-01..02, HYG-01); roadmap Phases 67–69 (proof → Hex 0.3.1 → mirrors); v1.18 Phase 66 execution tree moved to .planning/milestones/v1.18-phases/ (durable path after phases.clear).
  • Phase 17 verified that v1.2 has no remaining requirement, integration, flow, or cleanup gaps before milestone archival.
  • Phase 16 recorded a recommendation, not a feature delivery: Stripe Tax support is the recommended next implementation milestone because it deepens the current Stripe-first path without promising any v1.2 schema, API, or processor changes.
  • Organization / multi-tenant billing remains a recommendation-only backlog candidate until host-owned org semantics, row-scoped tenancy checks, and cross-tenant billing leakage protections are explicit.
  • Revenue recognition / exports remains a recommendation-only backlog candidate until host-authorized export audiences, storage, and delivery rules are explicit, preserving the wrong-audience finance exports boundary.
  • Official second processor adapter remains a recommendation-only planted seed because Accrue is still Stripe-first and host-owned, and future work must avoid a processor-boundary downgrade.
  • Any future tax milestone must preserve tax rollout correctness by requiring customer location capture plus legacy recurring-item migration planning before maintainers schedule implementation.
  • v1.3 planning resolves the Phase 16 backlog tradeoff by implementing Stripe Tax and Sigra-first org billing together, while keeping finance work to Stripe Revenue Recognition, Sigma, and Data Pipeline handoff documentation.
  • Phase 18 validated the first Stripe Tax slice: public subscription and checkout tax enablement, Stripe/Fake adapter parity, and narrow local automatic-tax observability.
  • Phase 19 validated tax-location capture/update, immediate invalid-location error handling, recurring tax-risk projection/admin visibility, host repair flow, and legacy recurring-item rollout safety guidance.
  • v1.6 (Phases 25–29) archived 2026-04-20: admin inventory, visual hierarchy, microcopy registry, a11y gates, and mobile CI without PROC-08/FIN-03/product-schema changes.
  • v1.6 planning line closed 2026-04-21: Phases 30–31 remediated milestone audit gaps (verification corpus, SUMMARY traceability) and advisory VERIFY-01 / Copy / Playwright integration notes; audit status passed in milestones/v1.6-MILESTONE-AUDIT.md.
  • v1.7 opened 2026-04-21: ADOPT + OPS requirements and Phases 32–36 roadmap; research summarized in .planning/research/SUMMARY.md.
  • v1.7 archived 2026-04-21: requirements + roadmap + milestone audit under .planning/milestones/v1.7-*; root REQUIREMENTS.md removed for next milestone; git tag v1.7.
  • v1.8 opened 2026-04-21: ORG-04 (non-Sigra org billing recipes + host integration depth); phases 37+; PROC-08 and FIN-03 remain deferred.
  • v1.8 closed 2026-04-22: Phases 37–39 complete; ORG-05..ORG-09 validated; adoption matrix + verify_adoption_proof_matrix.sh + scripts/ci/README.md ORG gates shipped; milestone archived under .planning/milestones/v1.8-*; root REQUIREMENTS.md removed for next milestone; git tag v1.8.
  • v1.9 opened 2026-04-21: Observability & operator runbooks after post–v1.8 prioritization; phases 40–42; PROC-08 / FIN-03 unchanged as non-goals.
  • v1.9 archived 2026-04-22: Phases 40–42 complete; OBS/RUN/TEL requirements validated; .planning/milestones/v1.9-*; root REQUIREMENTS.md removed for next milestone; git tag v1.9.
  • v1.10 opened 2026-04-21: Metered usage + Fake parity; phases 43–45; requirements MTR-01..MTR-08; phases.clear skipped to preserve 40–42 phase trees.
  • Phase 45 closed 2026-04-22: docs + telemetry/runbook alignment (MTR-07, MTR-08) — metering guide, telemetry semantics anchor, runbook branches, optional testing/README cross-links.
  • 2026-04-22: .planning/REQUIREMENTS.md MTR-01..MTR-06 checkboxes + traceability table aligned to Phase 43 / 44 passed verification (was still “Pending” after Phase 45 close).
  • 2026-04-22: v1.10 milestone archived (milestones/v1.10-*); root REQUIREMENTS.md removed for next milestone; git tag v1.10.
  • 2026-04-22: v1.11 opened — Hex release + post-release continuity; Phases 46–47; requirements REL-01..REL-04, DOC-01..DOC-02, HYG-01.
  • 2026-04-22: v1.11 archived (milestones/v1.11-*); root .planning/REQUIREMENTS.md removed for next milestone; planning git tag v1.11.
  • 2026-04-22: v1.12 opened — Admin & operator UX; Phases 48–50; requirements ADM-01..ADM-06; phases.clear skipped (preserve 40–47 phase trees).
  • 2026-04-22: v1.12 closed — Phases 48–50 complete; ADM-01..ADM-06 validated; VERIFY-01 copy export + subscriptions axe coverage shipped in Phase 50.
  • 2026-04-22: v1.12 milestone archived (milestones/v1.12-*); root .planning/REQUIREMENTS.md removed for next milestone; planning git tag v1.12.
  • 2026-04-22: v1.13 opened — Integrator path + secondary admin parity; Phases 51–53; requirements INT-01..INT-05, AUX-01..AUX-06; phases.clear skipped (preserve 1–50 phase trees).
  • 2026-04-23: v1.13 milestone archived (milestones/v1.13-*); root .planning/REQUIREMENTS.md removed for next milestone; planning git tag v1.13.
  • 2026-04-22: /gsd-new-milestonev1.14 opened (Companion admin + billing depth); Phases 54–56; requirements ADM-07..ADM-11, BIL-01..BIL-02; domain research skipped (brownfield); phases.clear skipped (preserve 1–53 trees).
  • 2026-04-23: /gsd-execute-phase 56BIL-01 / BIL-02 delivered (list_payment_methods, docs, installer template); v1.14 requirement checklist complete in .planning/REQUIREMENTS.md.
  • 2026-04-23: /gsd-complete-milestone v1.14 — archives milestones/v1.14-*, root REQUIREMENTS.md removed for next milestone, planning tag v1.14.
  • 2026-04-23: v1.15 opened — Release / trust semantics; forcing function B (adoption readiness plan); .planning/REQUIREMENTS.md recreated (TRT-01..TRT-04); roadmap phases 57–58.
  • 2026-04-23: /gsd-complete-milestone v1.15 — archives milestones/v1.15-*, git rm .planning/REQUIREMENTS.md, planning tag v1.15.
  • 2026-04-23: /gsd-new-milestonev1.16 opened (Integrator + proof continuity); REQUIREMENTS.md (INT-06..INT-09); roadmap phases 59–61.
  • 2026-04-23: /gsd-complete-milestone v1.16 — archives milestones/v1.16-*, root REQUIREMENTS.md removed for next milestone, planning tag v1.16.
  • 2026-04-23: /gsd-new-milestonev1.17 opened (Friction-led developer readiness); REQUIREMENTS.md (FRG-01..FRG-03, INT-10, BIL-03, ADM-12); roadmap phases 62–65; phases.clear executed (43 trees).
  • 2026-04-23: /gsd-execute-phase 6565-VERIFICATION.md, inventory ADM-12 maintainer line, REQUIREMENTS.md ADM-12 complete; v1.17 milestone requirements satisfied.
  • 2026-04-23: /gsd-complete-milestone (v1.17) — archives milestones/v1.17-*, root REQUIREMENTS.md removed for next milestone, audit-open Phase 62 UAT gap acknowledged in STATE.md, planning tag v1.17.
  • 2026-04-23: /gsd-new-milestone (trajectory plan)v1.18 opened (Onboarding confidence, proof-first); REQUIREMENTS.md (UAT-01..UAT-05, PROOF-01); roadmap Phase 66; v1.17 phase trees archived under milestones/v1.17-phases/; .planning/phases/ cleared for new work.
  • 2026-04-23: /gsd-complete-milestone v1.1866-01..03-SUMMARY.md backfilled; archives milestones/v1.18-*; git rm .planning/REQUIREMENTS.md for fresh next milestone; planning tag v1.18.
  • 2026-04-24: /gsd-discuss-phase 69 — Subagent-backed D-01..D-04 locked in 69-CONTEXT.md (HYG vs DOC boundary, planning file SSOT roles, bash-first verifier coupling, pin-first capsules).
  • 2026-04-24: /gsd-execute-phase 6969-VERIFICATION.md (DOC + HYG); REQUIREMENTS.md DOC-01..02 / HYG-01 Complete; PROJECT, MILESTONES, STATE Hex 0.3.1 mirror pass.
  • 2026-04-24: /gsd-complete-milestone v1.19 — archives milestones/v1.19-*, git rm .planning/REQUIREMENTS.md for fresh next milestone, planning tag v1.19 (gsd-sdk query milestone.complete still blocked on phases-archive; manual archives).
  • 2026-04-24: /gsd-new-milestone v1.26First-hour billing facade spine; REQUIREMENTS.md (INT-13, INV-04); roadmap Phases 82–83; domain research skipped (integrator parity with v1.24–v1.25 patterns).
  • 2026-04-24: v1.20 bootstrap/gsd-new-milestone plan implementation (A + B): v1.17-P1-001 closed in friction inventory; production-readiness.md + cross-links; REQUIREMENTS.md (INV-01..02, PRD-01..02); Phases 70–71 verification; v1.19 execution trees moved to .planning/milestones/v1.19-phases/.
  • 2026-04-23: /gsd-new-milestonev1.21 opened and Phases 72–73 verified (Maturity posture and diminishing returns); REQUIREMENTS.md (MAT-01..MAT-02, INT-11); maturity-and-maintenance.md + PROJECT maintenance bar + scripts/ci/README.md capsule checklist (v1.17-P2-001 closure); commit docs: open v1.21 maturity posture (MAT-01..02, INT-11).

Evolution

This document evolves at phase transitions and milestone boundaries.

After each phase transition (via /gsd-transition):

  1. Requirements invalidated? → Move to Out of Scope with reason
  2. Requirements validated? → Move to Validated with phase reference
  3. New requirements emerged? → Add to Active
  4. Decisions to log? → Add to Key Decisions
  5. "What This Is" still accurate? → Update if drifted

After each milestone (via /gsd-complete-milestone):

  1. Full review of all sections
  2. Core Value check — still the right priority?
  3. Audit Out of Scope — reasons still valid?
  4. Update Context with current state

Last updated: 2026-04-26 — v1.30 opened — 1.0.0 Declaration (Spine A): REL-05..08 (linked 1.0.0 publish + CHANGELOG 1.0.0 entries + RELEASING.md post-1.0 cadence + planning tag v1.30) + PPX-09..12 (final contract sweep at 1.0.0) + HYG-02 (.planning/ mirror at 1.0.0) + DOC-03..04 (Stability flipped to "1.0.0 stable"; PROC-08/FIN-03 non-goals reaffirmed) + INV-07 (post-1.0 friction-inventory maintainer pass). Continues from v1.29 Phase 90 → starts at Phase 91.